Jobs · Healthcare · Virginia

Per Diem Veterinary Assistant - DC / Maryland / Virginia

Change Order · Virginia, United States · 2 mo ago
HealthcareFull-time

About the role

Small Door is membership-based veterinary care designed with human standards that is better for pets, pet parents, and veterinarians alike. We offer a reimagined veterinary experience via a membership that includes exceptional care, 24/7 telemedicine, and transparent pricing—delivered with modern hospitality in spaces designed by animal experts to be stress-free.

At Small Door, our veterinary assistants are part of a supportive and collaborative network invested in their growth. You’ll work in state-of-the-art facilities with strong doctor-to-nurse staffing ratios, supported by a 24/7 telehealth team and dedicated call center that reduces incoming calls to the practice, allowing you to focus on the pets in front of you. We are committed to a healthy work/life balance and to creating and maintaining a positive work culture. In addition to practicing Fear Free, we are AAHA accredited, meaning we abide by incredibly high standards as an organization.

Responsibilities

  • Knowledge and ability to recognize medical emergencies and illnesses
  • Assessing patients
  • Recording vitals and assisting doctors with diagnostics
  • Completing treatments as instructed by the doctor
  • Basic husbandry and nursing care
  • Monitoring changes in patients and providing compassionate care
  • Assisting in and facilitating radiography capture
  • Preparing samples for outside reference labs
  • Running in-house labs
  • Preparing medications
  • Administering medications
  • Working tele-triage shifts (additional stipend)
  • Additional responsibilities to maintain a hospitable environment

Requirements

  • 2+ years of experience as a veterinary assistant
  • Availability to work weekends (Saturday or Sunday)
  • Comfortable with computers and online tools
  • Strong enough to lift 50 lbs
  • A thoughtful and fearless team player
  • A go-getter who thrives in a fast-paced environment
  • Skilled at communicating with clients
  • Passionate about pets

Benefits

  • Competitive compensation
  • A chance to make a meaningful impact in a collaborative, supportive environment
  • A team that lives by our core values and always has your back

Small Door operates in New York City, Boston, Washington DC, Maryland, and Virginia with continued expansion plans in 2026.

Similar jobs