Jobs · Engineering · Michigan

Molding Technician - 3rd Shift

Summit Polymers · Sturgis, MI · 3 wk ago
EngineeringFull-time

Responsibilities

  • Safely performing injection mold changes and machine start-ups in the proper sequence and within time standards
  • Complying with all SPI requirements for Personal Protective Equipment such as, but not limited to, hard hats, heat gloves/sleeves, steel toed shoes, eye protection, etc.
  • Performing lockout/tagout per requirements and safely operating equipment such as cranes, side load systems, hot runner controllers, etc. per standard work procedures
  • Troubleshooting basic machine and equipment problems
  • Troubleshooting basic robot problems
  • Demonstrating basic knowledge of mold construction and function and is able to assist in the initial troubleshooting process
  • Performing basic Robot End-Of-Arm-Tooling maintenance and repair
  • Completing machine process adjustments, within prescribed limits, to ensure that product meets specifications
  • Identifying non-standard work and machine conditions that are potential safety concerns and taking appropriate action
  • Effectively communicating and advising on product and production concerns with peers on other shifts
  • Aiding the supervisor in managing shift activities and training of operators, utilities and other mold techs
  • Completing daily production paperwork
  • Utilizing Summit Lean Manufacturing Systems principles to monitor inventory, schedule and run production
  • Completing general housekeeping principles
  • Aiding, as needed, in the grinding of runners and scrap parts

Qualifications

The Mold Tech position is a progressive position requiring diligent completion of training requirements over 3 levels and within prescribed time frames in order to achieve fully qualified status and remain in the position.

Training

  • Level 1 Side Load – Completed within 5 weeks of placement in position
  • Level 1 Top Load – Completed within 2 weeks of completion of Level 1 Side Load (6 weeks after hire)
  • Level 2 – Completed within 18 weeks of completion of the Level 1 Top Load (24 weeks after hire)
  • Level 3 – Completed within 54 weeks of completion of Level 2 (18 months after hire)

Required Knowledge, Skills, And Abilities

  • Agreement to complete of all required post-hire training modules within specified time frame
  • A minimum score in the 50th percentile on the DAT Mechanical Reasoning Test
  • A minimum score of 50 on the Wonderlic Select (Traditional score of 16 on the Cognitive portion)
  • Meet the physical requirements for the position
  • Physically capable of standing and walking for the entire shift
  • Must be able to lift 60 pounds repeatedly
  • Repeatedly bent and lifted during the shift
  • Must be able to wear steel-toed footwear
  • Adequate visual acuity to enter/revise molding press programming
  • Must be able to meet requirements for crane license
  • Must be capable of exerting up to 150 foot pounds on torque wrench
  • Must be able to work around a magnetic field

Similar jobs

3rd Shift Mold Tech

AmcorMuscatine, IA· 2 mo ago
Engineeringapply on amcor.wd5.myworkdayjobs.com