Mechanical Project Manager - Data Center Construction
About the role
Turner & Townsend is seeking a Mechanical Project Manager – Data Center Construction with Field Experience to support a high-profile data center construction project. This individual will be responsible for overseeing the General Contractor’s construction activities, with a strong focus on reporting on schedule status back to the project owner. The ideal candidate will bring deep technical expertise from working in the field, strong leadership, and a background in large-scale data center/mission critical works or electrical contracting environments.
Responsibilities
- Effectively manage and collaborate with project stakeholders.
- Communicate effectively across the internal team to ensure efficiency and consistent delivery to the client.
- Analyze, track, and manage critical milestone activities to avoid schedule slip.
- Verify that effective project governance, processes, and systems are utilized.
- Ensure application of best practice on all projects.
- Produce formal project status reports and other reports as required.
- Monitor the progress of multiple construction projects simultaneously to ensure approved design standards are applied correctly.
- Manage the interface between all suppliers through monthly trackers and weekly reviews.
- Manage the flow of project information between the project team through regular meetings and written communications.
- Forecast and update key project milestones.
- Manage and monitor local design teams in accordance with commission criteria.
- Provide technical support to owners, architects, general contractors, and regional stakeholders.
- Rapid response to RFIs from the field.
- Provide expertise for cost control, value engineering, and constructability guidance where required.
- Independently review status reports, drawing submittals, timelines, and costs from architects, contractors, and suppliers.
- Assist in developing excellent working relationships with clients, with a view towards maximizing new opportunities.
- Provide strategic advice to project teams on approaches to achieve both client and business objectives.
- Ensure key information and learnings generated from each project are captured.
- Identify ways to improve internal systems and processes.
- SOX control responsibilities may be part of this role, which are to be adhered to where applicable.
Qualifications
- Bachelor’s degree in Mechanical Engineering, Construction Management, or related field.
- Minimum 5+ years of electrical project management experience, ideally in data center construction or with an electrical contractor.
- Experience with substation and power distribution systems preferred.
- Familiarity with MEP design.
- Strong leadership, communication, and problem-solving skills.
- Proficiency in project management tools.
- Knowledge of relevant codes, standards, and construction methodologies.
- Proficiency in the Data Center Commissioning Process (levels 1–5).
- Proficiency managing construction documents including BODs, specifications, contract drawings, C/D/E’s, equipment submittals, and RFIs.
- Proficiency in Excel, Word, PowerPoint, Outlook, Procore, P6, CxAlloy, and other construction project management tools.
Pay
The salary range for this full-time role is $135K–$175K per year. Ranges are determined by role and level and represent a good faith effort to provide a fair and equitable salary. This range reflects base salary only, not total compensation. Turner & Townsend reserves the right to pay more or less than the posted range depending on the candidate’s experience and qualifications.