Jobs · Engineering · Alabama

Mechanical Project Engineer Data Center Construction

FTI · Montgomery, AL · 1 wk ago
EngineeringFull-time

You’ve discovered something special—a company that cares about leading the way in construction, engineering, manufacturing, and renewable energy. We redefine how energy is designed, applied, and consumed, grow thoughtfully to meet market demands, and foster a Culture of Care as “one of the Healthiest 100 Workplaces in America.”

About the role

The Mechanical Project Engineer (PE - Mech) supports execution of mechanical systems on hyperscale data center projects under the FTI / Excellerate delivery model. This role focuses on coordination, documentation, and technical support for complex cooling systems, prefabricated assemblies, and failure-domain-based infrastructure, ensuring safe, high-quality, and on-schedule project delivery.

Responsibilities

  • Project Coordination & Execution Support
    • Support Mechanical Project Manager and site leadership in day-to-day execution of mechanical scope
    • Coordinate with superintendents, trade partners, and project controls to track progress and resolve issues
    • Assist in development and tracking of detailed work plans, schedules, and resource needs
    • Monitor installation progress and identify risks impacting schedule, cost, and quality
  • RFI, Submittals & Document Control
    • Prepare, track, and manage RFIs to resolve design and field issues
    • Coordinate and review mechanical submittals, shop drawings, and equipment data to ensure compliance with project requirements
    • Maintain submittal logs and ensure processing aligned with installation schedules
    • Support change management processes tied to schedule, RFIs, and design updates
  • Mechanical Systems Coordination
    • Support installation and coordination of: MES & TWMUs, FSHAC & MSA, Piping interconnections, Mechanical system interfaces
    • Assist with ensuring systems are installed per Takt team requirements and timing
    • Coordinate with controls teams for system integration and commissioning readiness
  • Prefabrication & Material Management
    • Support coordination of Excellerate prefabrication scope, including fabrication tracking, delivery, and site integration
    • Assist in tracking of mechanical equipment and materials
    • Maintain delivery paperwork, inspection reports, and invoicing of mechanical MOFE equipment
  • Field Support & Quality Assurance
    • Support field teams in resolving technical issues, design clarifications, and installation challenges
    • Participate in site walks, inspections, and quality verification efforts
    • Assist with tracking punch list items and ensuring closure prior to turnover
    • Help ensure installations meet design specifications and quality standards
  • Schedule, Reporting & Communication
    • Assist with updating and maintaining project schedules and progress reports
    • Participate in coordination meetings and communicate issues, risks, and progress updates
    • Maintain clear communication between field teams, design teams, and project leadership
  • Safety & Compliance
    • Promote and enforce a strong safety culture across all mechanical activities
    • Ensure compliance with company policies, site safety plans, and regulatory requirements
    • Support implementation of project-specific safety plans and procedures
    • Monitor field activities and report safety concerns
  • Commissioning & Turnover Support
    • Assist with system startup, testing, and commissioning activities
    • Support documentation, as-builts, and turnover packages
  • Performs other related duties as required and assigned.

Requirements

  • Education: Bachelor’s degree in Mechanical Engineering, Construction Management, or related field (or equivalent experience).
  • Experience: 2 to 6+ years of construction or engineering experience, ideally with a focus on mechanical systems. Experience working on mission-critical or data center projects is preferred, along with a foundational understanding of HVAC and piping systems and familiarity with construction coordination processes.
  • Travel: 10-20%

Skills

  • Strong organization and attention to detail (RFI, submittal, and tracking focus)
  • Ability to manage multiple priorities in a fast-paced environment
  • Effective communication across field and engineering teams
  • Problem-solving mindset with willingness to learn complex systems
  • Familiarity with document control and coordination platforms (ACC, Procore, etc.)

Schedule

This position works between the hours of 6 am and 6 pm, Monday through Friday.

Benefits

FTI provides industry-leading benefits as an investment in the lives of team members and their families. Benefits include:

  • Competitive, merit-based compensation
  • Career path development and continued education programs
  • A flexible and robust benefits package (review the full list of FTI benefits available to regular/full-time team members)

FTI is a “merit to the core” organization, recognizing and rewarding top performers.

Similar jobs