Jobs · Manufacturing

Manager, Preconstruction Scheduling

Nscale · Seattle, WA · 1 mo ago
RemoteRemoteManufacturing$120k/yrFull-time

Role Overview

About the role

Nscale is seeking a Manager, Preconstruction Scheduling to lead project schedule development at a campus level for new builds across the company portfolio. Reporting to the Director, Preconstruction Scheduling, you will provide professional scheduling capabilities that directly enable Nscale's speed to market.

Responsibilities

  • Develop and manage the Preconstruction Schedules, responsible for generation, maintenance, and publication of project-specific integrated delivery schedules and supporting basis of schedule documents across the active portfolio

  • Develop conceptual and detailed schedules for multiple user groups including New Site Development, Construction, Energy, AI Infrastructure, Design and Procurement

  • Review external Prime Contractor, Power & Utility, Design, Subcontractor, and Procurement schedules throughout the planning phase of the project lifecycle

  • Integrate internal and external workstream fragnet schedules into a single cohesive integrated delivery schedule

  • Define activities and associated scope, duration, logic, interface, and resource loading

  • Investigate and incorporate project constraints — site, market, and regulatory — into the planning effort

  • Create, review, and analyze critical path schedules independently, efficiently, and comprehensively

  • Develop schedule variance analysis, including Monte Carlo and other risk analysis scenarios

  • Work with peer groups to incorporate feedback on product, market, and site-specific factors to create detailed due diligence schedules supporting land acquisition, leasing, and major capital expenditure

  • Iterate on project development scenarios and communicate tradeoffs through verbal, written, and graphical means appropriate to project goals

  • Provide input on policies and procedures for scheduling in coordination with peer departments

  • Support the development of P6 cloud training guidelines and roll out to teams

  • Apply principles of cost estimating and productivity in establishing schedule parameters (duration, resource loading, etc.)

  • Develop data analysis for development schedules and issue management reports per project procedures

  • Ensure consistency of updates and reporting. Your project data will directly input into NA-ELT facing dashboards, reporting, and publications to support leasing, commercial negotiations, and project status updates

  • Drive continuous improvement to scheduling business processes in collaboration with vertical peers

Qualifications

  • Bachelor's Degree in Construction Management or a relevant functional discipline, or equivalent combination of education and experience

  • 6+ years of related work experience in construction scheduling

  • Data center or mission-critical facility experience strongly preferred

  • Strong theoretical and applied understanding of the Critical Path Method (CPM) of scheduling

  • Expert knowledge of Primavera P6 (latest version) and MS Project

  • Extensive experience with ProCore and PowerBI strongly preferred

  • Experience creating schedule risk matrices and applying risks via Monte Carlo analysis preferred

  • Ability to understand and accurately interpret construction documents — drawings, specifications, and contracts — at all design levels

  • Proficiency in Microsoft Office tools including Excel, PowerPoint, SharePoint, and Word

  • Willingness to travel up to 20% based on business needs

Pay

The range below reflects the base salary for the position. Actual compensation may vary based on job-related factors such as skill set, experience, education, and location. In addition to base salary, this role may be eligible for bonus, equity, and/or commission programs.

Schedule

Nscale may offer a competitive benefits package including medical, dental, vision, flexible paid time off, parental leave, and retirement plan participation.

Similar jobs

Manager Preconstruction

ProCraft MechanicalBroomfield, CO· 2 mo ago
Management$100k–$150k/yrapply on recruitingbypaycor.com

Manager, Preconstruction

STACK InfrastructureDenver Metropolitan Area· 4 wk ago
Management$128k–$146k/yrapply on stackinfra.wd108.myworkdayjobs.com

Manager, Preconstruction

STACK InfrastructureSterling, VA· 1 mo ago
Managementapply on stackinfra.wd108.myworkdayjobs.com