Intermediate Controls Engineer
LAPORTE · Rochester, NY · 1 wk ago
HybridConsultingFull-time
About the role
We’re seeking a full-time controls engineer to join our expanding team and contribute to the design, programming, and management of automation projects in the pharmaceutical and food & beverage industries.
Responsibilities
- Lead and support the design of automation projects, developing specifications for control panels, networks, and software (primarily Allen-Bradley PLC/PACs and Factorytalk View ME/SE HMI and SCADA).
- Translate process or packaging applications into detailed construction packages for control panel designs and electrical installation scopes. Construction packages typical include equipment arrangement drawings, schematics, wiring diagrams, cable schedules, control panel drawings, etc.
- Mentor and supervise project team members, enhancing team collaboration and project execution.
- Provide comprehensive lifecycle support for projects, including system design, troubleshooting, testing, and commissioning.
- Perform site surveys and offer hands-on support during installation, focusing on control system deployment.
- Adhere to and ensure compliance with relevant codes (UL508A, NEC) and standards.
- Engage in diverse projects, enhancing your engineering and project management skills.
Qualifications
- Bachelor’s degree in chemical engineering, Mechanical Engineering, Electrical Engineering, or Electrical Engineering Technology.
- 2-6 years of experience in control systems, manufacturing, or consulting-design environments including experience commissioning systems, preferably as a lead.
- Proficient in automation project tasks including design, client coordination, and bid package preparation.
- Skilled in control panel and network design, instrument selection, and control system programming.
- Proficiency with AutoCAD for control panel design and electrical construction packages.
- Familiarity / Experience with electrical engineering construction packages – single line diagrams, panel schedules, power plans, etc.
- Hands-on experience surveying existing control installations and preparing as-built conditions of systems.
- Hands-on experience with Rockwell Automation software—Studio 5000 / RSLogix 5000 for PLC programming and FactoryTalk View ME / SE for HMI and SCADA development.
Pay
Competitive salary.
Schedule
Travel expectations are dependent on specific project requirements by typically requiring 1-3 days for an initial site visit and then a return trip to lead commissioning efforts which may take 1-4 weeks. Overall travel is anticipated to be 20-40%.