Jobs · Project Management · Maryland

Datacenter Construction Project Manager (Full-Time)

MBP (McDonough Bolyard Peck) · Columbia, MD · 2 wk ago
On-siteProject Management$122k–$185k/yrFull-time

MBP is seeking leaders in the design and construction industry to support the delivery of complex projects and programs in the Washington/Baltimore DC metropolitan area.

About the role

We seek candidates with 10 or more years of combined education and/or experience and demonstrated advanced knowledge and expertise in the installation of complex Mechanical, Electrical, Plumbing, and/or related systems. Experience in supporting the successful delivery of new and/or renovated laboratory, data center, and/or secure facilities with SCIFs is desired. Evidence of progressive career development and demonstrated expertise in quality control, quality assurance, construction management, field engineering, or related fields.

Responsibilities

  • Provide pre-construction and on-site owner representation for medium- to large-scale construction projects, either as part of a team or independently, depending on the project's size and complexity.
  • Manage cost, schedule, and/or quality on behalf of the client/owner.
  • Work collaboratively with the project delivery team to proactively identify risks and issues and develop mitigation strategies.
  • Review project schedules to verify they are complete, feasible, and reasonable. Specific scheduling experience is desired but not required.
  • Review and track progress against the accepted schedule.
  • Participate and/or lead progress meetings. Prepare meeting minutes or review meeting minutes prepared by others to verify completeness and accuracy.
  • Provide quality management, including participation in preparatory/pre-installation meetings, and perform or oversee the performance of Quality Assurance (QA) inspections to verify that work is being performed in compliance with contract requirements.
  • Document and track issues until resolution, including working collaboratively with the contractor, designer, and owner to resolve issues as they arise.
  • Review change order proposals for entitlement and price, and lead or assist in negotiations.
  • Coordinate and oversee commissioning agent and other third-party owner contractors.
  • Coordinate punchlist and acceptance with the designer and other project stakeholders.
  • Monitor and verify completion of closeout requirements, including owner training, operations and maintenance manuals, warranties, and stock materials.

Requirements

  • High school or General Equivalency Diploma (GED), plus 15 years of related experience and/or education.
  • Bachelor’s degree in engineering, architecture, construction management, or related field, plus 10 years of related experience.
  • Possess OSHA 30-hour certification or obtain within 3 months of hire.
  • Working knowledge of basic mathematics, including computations based on field measurements.
  • Considerable construction-related training or a combination of education and experience that demonstrates the ability to perform the job.
  • Knowledge of codes, materials, methods, and tools utilized in construction, repair, or renovation work.
  • Preferred certifications include CQM (Construction Quality Management), CCM (Certified Construction Manager), Journeyman or Master certification/license.
  • Knowledge of construction practices, principles of construction management and project controls, with working knowledge in areas including scheduling, cost estimating, documentation, contract administration, and construction techniques.
  • Must be a US Citizen.
  • Applicants must be authorized to work in the U.S. without sponsorship.

Skills

  • Ability to work independently and handle all aspects of a project, including client interface, technical issues, documentation, and reporting.
  • Exercises tact and diplomacy in dealing with sensitive and complex issues and situations.
  • Ability to identify potential problems and derive recommended solutions from past experiences.
  • Specialized expertise with quality assurance and quality control techniques.
  • Proficient in using Microsoft Office applications, Email, Internet navigation, web-based tools, and other specialized equipment.
  • Ability to read and interpret plans and contract specifications.
  • Ability to communicate quality issues effectively and responsibly (verbally and in writing) with internal and external customers (e.g., contractors, owners, subconsultants, designers, architects, and fellow team members).
  • Ability to obtain and maintain required certifications.
  • Ability to stand and sit as needed on project work sites, climb ladders, work at heights, and work outdoors in a wide range of weather conditions.
  • Ability to safely navigate construction work sites with uneven terrain.

Special Requirements

  • Criminal history background check, reference verification, and work history will be required prior to employment.

Pay

The base salary range for this position is $122,000.00 to $185,000.00. Actual compensation will be determined based on work location, qualifications, experience, job-related skills, and relevant education or training.

Benefits

  • Competitive compensation with opportunities for semi-annual bonuses.
  • Generous Paid Time Off and holiday schedules.
  • 100% Employer paid medical, dental, vision, life, AD&D, and disability benefits (for individual).
  • Health Savings Account with company contribution.
  • 401(k)/Roth 401(k) plan with company match.
  • Tuition Assistance and Student Loan Reimbursement.
  • Numerous Training and Professional Development opportunities.
  • Wellness Program & Fitness Program Reimbursement.

Similar jobs