Construction Scheduler – T&D/Substation
Quanta Infrastructure Solutions Group · Columbus, OH · 3 wk ago
RemoteRemoteManagementFull-time
About the role
The Scheduler – Utility T&D & Substation role at QISG supports utility transmission and distribution (T-Line) and substation EPC projects. Key responsibilities include developing and managing Primavera P6 schedules, performing critical path analysis, and collaborating with project teams.
Responsibilities
- Develop and manage resource- and cost-loaded Primavera P6 schedules for utility transmission, substation, and renewable projects
- Integrate inputs from engineering, procurement, construction, and commissioning teams
- Perform critical path analysis, what-if scenarios, and productivity tracking
- Identify and recommend mitigation strategies for schedule risks
- Generate earned value metrics, KPIs, and cash flow reports for project controls and executives
- Support look-ahead planning, short-interval schedules, and continuous improvement
- Maintain compliant schedule documentation per contract and company standards
Requirements
- 5+ years of scheduling experience supporting utility transmission lines (T-Line) and substations
- Advanced Primavera P6 expertise, including cost- and resource-loaded schedule development
- Familiarity with linear scheduling, large-scale sitework, and long-lead equipment planning for utility projects
- Experience with TILOS, Deltek Acumen Fuse/Risk, or similar schedule analysis tools
- Proven ability to collaborate with engineering, permitting, procurement, construction, and commissioning teams
- Strong communication and influencing skills, coordinating across multiple departments
- Highly organized and self-motivated, able to manage multiple priorities in fast-paced environments
Qualifications
- High school diploma required; Bachelor’s in Engineering, Construction Management, Business, or related field preferred
Skills
- Primavera P6 scheduling
- Scheduling utilities transmission and distribution lines (T-Line)
- Scheduling utilities substations
- Collaboration with engineering, permitting, procurement, construction, and commissioning teams
Benefits
- Competitive base salary
- Generous PTO & paid holidays
- 401(k) with a generous match
- Comprehensive benefits – medical, dental, vision, and life insurance
- Weekly pay for consistent, reliable compensation
- Great mentoring & career growth opportunities
Pay
Competitive base salary
Schedule
Full-time, with up to 40% domestic travel to project sites