Jobs · Management · Texas

Construction Scheduler, NA

Vantage · Shackelford County, TX · 1 mo ago
On-siteManagementFull-time

About the role

Based on‑site in Shackelford County, Texas, the Construction Scheduler will drive overall project schedule durations at a programmatic level across Vantage’s data‑center portfolio. The role joins the Project Controls team to provide professional scheduling capabilities, creating schedules at every stage of the project lifecycle and identifying ways to re‑sequence work to shorten overall project durations.

Responsibilities

  • Develop policies and procedures for scheduling and facilitate user training with internal and external stakeholders.
  • Prepare conceptual and detailed schedules; define activities, scope, durations, logic, and resource loading.
  • Create, review, and analyze critical‑path schedules independently and efficiently.
  • Develop comprehensive plans that communicate programs, projects, and strategic goals.
  • Represent a realistic and feasible planning approach for the Construction team.
  • Communicate schedule information clearly through verbal, written, and graphical means.
  • Monitor schedule performance data, perform complex data analysis, and issue schedule reports required by management.
  • Understand cost estimating and productivity principles to establish schedule parameters.
  • Incorporate project constraints into planning efforts and perform Time Impact Analysis and claims analysis.
  • Utilize Acumen Fuse (or similar) to monitor schedule performance and develop variance analysis.
  • Run schedule risk scenarios using Monte Carlo and other risk‑analysis techniques.
  • Collaborate with vertical peers to continuously improve business processes.

Requirements

  • Bachelor’s degree in Construction Management, Engineering, Quantity Estimating, or a related discipline, or equivalent combination of education and experience.
  • 3–5 years of related work experience; data‑center experience strongly preferred.
  • Demonstrated understanding of the Critical Path Method and its application to projects.
  • Ability to interpret construction documents (drawings, specifications, contracts/general conditions) at all design levels.
  • Physical ability to stand, walk, sit, climb stairs, stoop, kneel, lift or move up to 25 lb, and perform other duties as described.
  • Travel up to 50 % based on business needs.

Skills

  • Expert knowledge of Primavera P6 (latest version).
  • Moderate experience with Procore and Power BI (strongly preferred).
  • Extensive proficiency with Microsoft Office tools: Excel, PowerPoint, SharePoint, and Word.
  • Strong analytical, communication, and risk‑analysis capabilities.

Benefits

  • Medical, dental, and vision coverage.
  • Life and AD&D insurance.
  • Short‑ and long‑term disability coverage.
  • Paid time off and employee assistance program.
  • 401(k) plan with company match and additional voluntary benefits.
  • Comprehensive health, welfare, retirement, and paid‑leave benefits exceeding local expectations.
  • Recognition, training, development opportunities, and a culture that values fun, collaboration, and mutual support.

Pay

Compensation will depend on qualifications, skills, competencies, and experience and may fall outside of the range shown. The role offers an above‑market total compensation package.

Similar jobs

Construction Scheduler

Zero Impact EnergySanta Ana, CA· 2 mo ago
Managementapply on zero-impact-solutions.careerplug.com