Jobs · Manufacturing · Tennessee

Construction Scheduler

Actalent · Mount Juliet, TN · 2 mo ago
On-siteManufacturing$68k–$85k/yrFull-time

About the role

The Construction Scheduler develops and manages detailed Critical Path Method (CPM) schedules for heavy civil construction projects, including Alternative Delivery and traditional Design-Bid-Build work. This role supports preconstruction and active projects by creating, updating, and analyzing schedules, coordinating with multidisciplinary teams, and ensuring alignment with contract, owner, and regulatory requirements.

Responsibilities

  • Develop detailed CPM schedules for Alternative Delivery projects such as Design-Build, Progressive Design-Build, CM/GC, as well as traditional Design-Bid-Build projects.
  • Support preconstruction and pursuit efforts by creating conceptual, proposal, and baseline schedules that accurately reflect project scope and strategy.
  • Cook up scheduling activities with project teams, design partners, subcontractors, and field personnel to ensure alignment and accuracy.
  • Maintain and update project schedules regularly, identifying risks, variances, and potential delays, and recommend corrective actions to keep projects on track.
  • Incorporate design revisions, utility coordination, permitting requirements, environmental constraints, and other project changes into schedule updates.
  • Prepare clear and comprehensive schedule narratives, milestone reports, dashboards, resource plans, and executive summaries for internal and external stakeholders.
  • Manage and coordinate equipment, staffing, and production schedules across multiple projects to optimize resources and productivity.
  • Perform Time Impact Analyses (TIA) and schedule evaluations to support change orders, delay analyses, and contract modifications.
  • Sequence major construction activities, including earthwork and mass grading, rock excavation and embankments, utility installation, bridge construction, and asphalt paving and roadway surfacing.
  • Develop traffic control and project phasing schedules that align with owner requirements and regulatory standards.
  • Provide guidance and training to project teams on CPM scheduling practices and effective utilization of Primavera P6.
  • Ensure all schedules comply with owner requirements, contract specifications, and organizational scheduling standards.
  • Participate in owner meetings, design coordination sessions, and project planning workshops to present schedules and support collaborative planning.
  • Support project controls and reporting efforts by integrating schedule data with other project information as needed.

Requirements

  • Ability to work full-time in an office environment with occasional visits to project sites.
  • Strong understanding of heavy civil construction methods, including earthwork, mass grading, and excavation.
  • Knowledge of water, sewer, and storm utility installation methods and sequencing.
  • Understanding of bridge foundations and structures and their integration into overall project schedules.
  • Experience with asphalt paving and roadway construction sequencing and constraints.
  • Knowledge of traffic control planning and phasing for roadway and infrastructure projects.
  • Experience supporting both Alternative Delivery and traditional Design-Bid-Build projects.
  • Advanced proficiency in Primavera P6, including logic development, resource loading, and critical path analysis.
  • Knowledge of Department of Transportation (DOT) and Federal Highway Administration (FHWA) standards, milestones, compliance requirements, and incentive/disincentive structures.
  • Ability to read and interpret civil construction plans, profiles, cross-sections, maintenance of traffic plans, and geotechnical reports.
  • Strong analytical skills with the ability to identify schedule risks, impacts, and mitigation strategies.
  • Strong verbal and written communication skills for presenting schedule information to diverse stakeholders.
  • Strong organizational skills with the ability to manage multiple project schedules and priorities simultaneously.
  • Proficiency with Microsoft Office Suite, including Excel, Word, and PowerPoint.
  • 3–5+ years of CPM scheduling experience in heavy civil construction.

Qualifications

  • Bachelor's degree in Construction Management, Civil Engineering, or a related field is preferred; equivalent industry experience will be considered.
  • Experience supporting transportation, infrastructure, roadway, bridge, or utility projects is preferred.
  • Experience with Alternative Delivery project methods, such as Design-Build, Progressive Design-Build, or CM/GC, is strongly preferred.
  • Experience preparing Time Impact Analyses, delay analyses, or claims support documentation is a plus.
  • Experience with project controls tools, collaborative design platforms, or model-based scheduling tools is a plus.

Skills

  • Ability to work full-time in an office environment with occasional visits to project sites.
  • Strong understanding of heavy civil construction methods, including earthwork, mass grading, and excavation.
  • Knowledge of water, sewer, and storm utility installation methods and sequencing.
  • Understanding of bridge foundations and structures and their integration into overall project schedules.
  • Experience with asphalt paving and roadway construction sequencing and constraints.
  • Knowledge of traffic control planning and phasing for roadway and infrastructure projects.
  • Experience supporting both Alternative Delivery and traditional Design-Bid-Build projects.
  • Advanced proficiency in Primavera P6, including logic development, resource loading, and critical path analysis.
  • Knowledge of Department of Transportation (DOT) and Federal Highway Administration (FHWA) standards, milestones, compliance requirements, and incentive/disincentive structures.
  • Ability to read and interpret civil construction plans, profiles, cross-sections, maintenance of traffic plans, and geotechnical reports.
  • Strong analytical skills with the ability to identify schedule risks, impacts, and mitigation strategies.
  • Strong verbal and written communication skills for presenting schedule information to diverse stakeholders.
  • Strong organizational skills with the ability to manage multiple project schedules and priorities simultaneously.
  • Proficiency with Microsoft Office Suite, including Excel, Word, and PowerPoint.
  • 3–5+ years of CPM scheduling experience in heavy civil construction.

Pay and Benefits

The pay range for this position is $68,000.00 - $85,000.00/yr. full time benefits, paid pto and holiday.

Workplace Type

This is a fully onsite position in Mt. Juliet, TN.

Application Deadline

This position is anticipated to close on Aug 7, 2026.

About Actalent

Actalent is a global leader in engineering and sciences services and talent solutions. We help visionary companies advance their engineering and science initiatives through access to specialized experts who drive scale, innovation and speed to market. With a network of almost 20,000 consultants and 5,000 clients across the U.S., Canada, Asia and Europe, Actalent serves many of the Fortune 500. We are proud to be an Engineering News-Record (ENR) Top 500 Design Firm for our engineering design services and a ClearlyRated Best of Staffing® winner for both client and talent service. The company is an equal opportunity employer and will consider all applications without regard to race, sex, age, color, religion, national origin, veteran status, disability, sexual orientation, gender identity, genetic information or any characteristic protected by law. If you would like to request a reasonable accommodation, such as the modification or adjustment of the job application process or interviewing process due to a disability, please email actalentaccommodation@actalentservices.com for other accommodation options.

San Francisco Fair Chance Ordinance

Pursuant to the San Francisco Fair Chance Ordinance, for all positions located in the city and county of San Francisco, we will consider for employment qualified applicants with arrest and conviction records.

Massachusetts Lie Detector

It is unlawful in Massachusetts to require or administer a lie detector test as a condition of employment or continued employment. An employer who violates this law shall be subject to criminal penalties and civil liability.

Similar jobs

Construction Scheduler

Rider Levett Bucknall RLBPhoenix, AZ· 5 mo ago
Managementapply on riderlb.rec.pro.ukg.net