Construction Schedule Manager
Gray is a fully integrated design-builder delivering end-to-end solutions across construction, professional services, specialty equipment, and real estate. Since 1960, Gray has grown from a regional contractor to a nationally ranked industry leader, serving top domestic and international companies in Manufacturing, Food & Beverage, Data Centers, Advanced Technology, and Distribution. Our integrated approach allows us to deliver value at every phase of a project—from designing and building state-of-the-art facilities to fabricating custom process equipment and implementing advanced automation.
About the role
Gray is seeking a Construction Schedule Manager to join our team in the Lexington office. The ideal candidate is an energetic, self-motivated individual who enjoys a team environment, values collaboration, and is passionate about professional development. If you are a high achiever striving to exceed expectations in a fast-paced, innovative company, Gray offers the opportunity to make a meaningful impact.
Responsibilities
- Provide schedule preparation, communication, review, validation, and interpretation during the design, construction, commissioning, and start-up of multiple manufacturing projects.
- Ensure schedules are produced, maintained, updated, and issued regularly throughout the duration of projects.
- Monitor trends and alert management to potential positive or negative effects.
- Generate schedules using process flow diagrams (PFDs), process and instrumentation diagrams (P&IDs), and traditional construction documents.
- Establish a general construction sequence and communicate the approach across all project workstreams.
- Travel to jobsites as necessary.
Requirements
- Minimum of 10 years’ experience in construction scheduling.
- Bachelor’s degree.
- Understanding of logic relationships in turnkey food and beverage manufacturing projects.
- Fundamental knowledge of design, process design, procurement, processing, packaging, material handling, and building systems.
- Proficiency in the latest versions of Microsoft Project and Primavera.
- Basic computer skills, including word processing, spreadsheets, software, and email.
- Excellent communication skills.
- Physically present in the Lexington office.
Physical Demands & Work Environment
- Frequently required to stand, walk, sit, use hands, reach with hands or arms, talk, or hear.
- Occasionally required to climb or balance, stoop, kneel, or crouch.
- Must occasionally lift and/or move up to 50 pounds.
- Specific vision abilities required include close vision.
- Normal office environment with moderate noise levels and controlled temperature/humidity.
- Overtime may be required.
Pay
A reasonable estimate of the current range is $100,000 to $150,000, taking into account skill sets, experience, training, certifications, and business needs.