Construction Manager, Data Center Construction
AWS Infrastructure Services owns the design, planning, delivery, and operation of all AWS global infrastructure — the people who keep the cloud running. You’ll join a diverse team of software, hardware, and network engineers, supply chain specialists, security experts, and operations managers collaborating across AWS to deliver the highest standards for safety, security, and seemingly infinite capacity at the lowest possible cost. As a Data Center Construction Manager you’ll serve as Amazon’s owner’s representative on construction sites daily, interacting with trades and directly responsible for driving cost, schedule, and quality while managing vendors and contractors building industry-leading, energy-efficient data centers. This position requires U.S. citizenship and domestic travel of 50% or more within the continental United States.
Responsibilities
- Construction project management and oversight of new builds and capital projects, owning project scope, quality, schedule, and budget
- Direct interface with construction general contractors during bidding, award, execution, and project closeout/punch list phases
- Conduct negotiations with general contractors and evaluate bids/proposals with detail and accuracy
- Create construction project scope and requests for proposals
- Financial analysis of construction projects
- Construction project management for initiatives aimed at increasing data center resiliency
- Constructability reviews of electrical and mechanical designs for new data centers or optimization of existing facilities
- Construction document management including submittal review, RFIs, change orders, and invoicing
- Construction project quality control
- Record and report key construction metrics to team members and management
- Drive teams to perform troubleshooting and root-cause failure analysis associated with equipment failures
- Serve as a leader within the group and across internal and external teams supporting the data center
Basic Qualifications
- Bachelor's degree in Electrical Engineering, Mechanical Engineering, or a related field
- Experience carrying new design concepts through exploration, development, and into deployment or mass production
- Experience with MS Excel, Word, and Windows Operating Systems
- Experience with power management and power monitoring systems
Preferred Qualifications
- 5+ years of project management in data centers or comparable critical infrastructure
- Knowledge of critical data center equipment
- Knowledge of engineering documentation, electrical diagrams, and standard operating procedures
- Knowledge of building codes and regulations including Life Safety, BOCA, NFPA, NEC, or OSHA
- Experience in Data Center Engineering Operations with deep understanding of electrical and mechanical data center infrastructure
- Experience reading and interpreting construction specifications and drawings for all domains
Benefits
- Health insurance (medical, dental, vision, prescription)
- Basic Life & AD&D insurance with option for Supplemental life plans
- Employee Assistance Program (EAP), Mental Health Support, Medical Advice Line
- Flexible Spending Accounts
- Adoption and Surrogacy Reimbursement coverage
- 401(k) matching
- Paid time off and parental leave
- Sign-on payments and restricted stock units (RSUs)
Pay
Base salary range: $111,300 – $186,100 USD annually (Fairfax, VA). Final compensation determined by experience, qualifications, and location.
Company: Amazon Data Services, Inc. | Job ID: A10534991