Associate Director- Scheduling - Data Center Construction
Turner & Townsend · Houston, TX · 2 wk ago
On-siteProject ManagementFull-time
Responsibilities
- Work in an integrated planning, cost and risk environment within the project to optimize the use of available resources to complete work plan scopes within budget and time constraints.
- Ensure that the established planning and scheduling methodology is followed in developing the project schedule.
- Develop Project Milestone and Progress tracking baselines.
- Absess subcontractor compliance with established scheduling methodology.
- Contribute to the development of the Work Breakdown Structure to support project performance measurement.
- Perform analysis of schedule data; identify trends, issues, and areas requiring attention and communicate to the Project Director and Team.
- Communicate and collaborate with both internal and external clients on the project schedule.
- Contribute to the coaching and mentoring of the planning team.
- Lead schedule reporting, including schedule forecast updates and schedule contingency management for specific work packages.
- Lead schedule updates, analysis, and reports in a timely manner.
- Ensure compliance with contractor schedules with the integrated schedules/milestones.
- Analyze resource requirements and availability impacts on the schedule and recommend recovery options.
Qualifications
- Bachelor’s degree in construction management, cost management, quantity surveying, engineering, or a field related to construction.
- Graduate degree in quantity surveying, cost management, construction management, or engineering is preferred.
- Minimum 8 years of relevant experience working in a scheduling role in the construction industry.
- Experience working in complex, fast-paced, multi-stakeholder environments which require proactive coordination to ensure project/program success.
- Practical exposure to network planning structures and techniques, experienced user of Primavera Project Planner 6.0 or above, and Microsoft Project.
- Ability to assist with wider business initiatives as needed, including responding to RFPs.
- Demonstrates excellent presentation, verbal, written, organizational, and communication skills.